Risk management report at M18

Summary
This report will be an updated report D12 verifying the methodology of the EN ISO 149712012 along with design and development of the four products which does not direct to any unacceptable risks up to the TRL8 The updated report should be performed based on the design changes for the industrial manufacturing scaling up and should accompany the submission of the relevant Technical Documentation regarding the four products to the Notified Body