Delivery of UOP for emulator tests

Summary
The real-size closed loop system and other components for the storage system (UOP) for emulator will be delivered. The system contains 1 m3 of storage material.This real-size module has a design based on demo version of TNO/TUE for emulator tests. The baseline is to develop transportable modules that enable easy transportation and installation in existing buildings.To deliver the UOP module it will be necessary to:- assess and advice on installation aspect of the real-size modules;- define the filling and commissioning procedures;- produce fabrication drawings of components and modules;- ordering and pre-fabrication of components and modules;- manufacturing and installation of sensors in storage modules;- specify the commissioning tests for dedicated components, storage modules and control.