Installation and commissioning

Summary
The first aim of this deliverable is to install the HEAT-INSYDE heat battery in each demonstration site with its advanced monitoring system. On-site delivery, installation and commissioning are arranged by the responsible of each demonstration site.Monitoring instrumentation will be selected and validated, so that selected KPI can be calculated based on the specific location. The monitoring process will be supervised, data will be regularly checked during the demonstration campaign and KPI will be analyzed continuously.For each demonstration site, the main outcomes of this task is a performance report of the energy system during a full season. KPI measured levels will be compared to expected energy consumption reduction goals with respect to a reference case built upon local site pre-existing equipment.