• About
  • Interesting shortcuts
  • Programmes and Partnerships
    • Search
    • European Partnerships
    • EU-Programme-Call
  • Projects
    • Projects
  • Resources
    • Resources
  • www.decubber.com
    • Login
  • Programmes and Partnerships
  • EU-Programme-Call
  • Horizon 2020
  • H2020-EU.3. SOCIETAL CHALLENGES
  • H2020-EU.3.4. SOCIETAL CHALLENGES - Smart, Green And Integrated Transport
  • H2020-EU.3.4.7. SESAR JU
  • H2020-EU.3.4.7.0. Cross-cutting call topics

H2020-EU.3.4.7.0. Cross-cutting call topics

Mapped projects (108)
  • H2020-SESAR-2015-2
    (25)
    • SESAR.IR-VLD.Wave1-01-2015 Content Integration
      (1)
    • SESAR.IR-VLD.Wave1-02-2015 Master Plan Maintenance
      (1)
    • SESAR.IR-VLD.Wave1-03-2015 Validation and Demonstration Engineering
      (1)
    • SESAR.IR-VLD.Wave1-04-2015 Increased Runway and Airport Throughput
      (1)
    • SESAR.IR-VLD.Wave1-05-2015 Integrated Surface Management
      (1)
    • SESAR.IR-VLD.Wave1-06-2015 Airport Safety Nets
      (1)
    • SESAR.IR-VLD.Wave1-07-2015 Total Airport Management
      (1)
    • SESAR.IR-VLD.Wave1-08-2015 Remote Tower for Multiple Airports
      (1)
    • SESAR.IR-VLD.Wave1-09-2015 Optimised Airspace Users Operations
      (1)
    • SESAR.IR-VLD.Wave1-10-2015 Advanced Airspace Management
      (1)
    • SESAR.IR-VLD.Wave1-11-2015 Advanced DCB
      (1)
    • SESAR.IR-VLD.Wave1-12-2015 Enhanced Arrivals and Departures
      (1)
    • SESAR.IR-VLD.Wave1-13-2015 Trajectory Based Free Routing
      (1)
    • SESAR.IR-VLD.Wave1-14-2015 Separation Management En-Route and TMA
      (1)
    • SESAR.IR-VLD.Wave1-15-2015 Enhanced Air and Ground Safety Nets
      (1)
    • SESAR.IR-VLD.Wave1-17-2015 CNS
      (1)
    • SESAR.IR-VLD.Wave1-18-2015 Common Services
      (1)
    • SESAR.IR-VLD.Wave1-19-2015 CWP - HMI
      (1)
    • SESAR.IR-VLD.Wave1-20-2015 SWIM Infrastructures
      (1)
    • SESAR.IR-VLD.Wave1-21-2015 4D Trajectory Management
      (1)
    • SESAR.IR-VLD.Wave1-22-2015 Integrated Airport Operations (incl. TBS)
      (1)
    • SESAR.IR-VLD.Wave1-23-2015 Network Collaborative Management
      (1)
    • SESAR.IR-VLD.Wave1-25-2015 Arrival Management extended to en-route Airspace
      (1)
    • SESAR.IR-VLD.Wave1-27-2015 Initial Trajectory Information Sharing
      (1)
    • SESAR.IR-VLD.Wave1-28-2015 Flight Information Exchange
      (1)
  • H2020-SESAR-2016-1
    (9)
    • RPAS-01 SESAR UTM Concept Definition
      (1)
    • RPAS-02 Drone information management
      (2)
    • RPAS-03 Aircraft systems
      (1)
    • RPAS-04 Ground-based technology
      (2)
    • RPAS-05 Datalink
      (1)
    • RPAS-06 Security & cyber-resilience
      (1)
    • RPAS-07 Science for higher levels of automation
      (1)
  • H2020-SESAR-2016-2
    (18)
    • SESAR-ER3-01-2016 Knowledge Transfer Network (KTN)
      (1)
    • SESAR-ER3-03-2016 Optimised ATM Network Services: TBO
      (2)
    • SESAR-ER3-04-2016 Enabling Aviation Infrastructure: CNS for General Aviation
      (1)
    • SESAR-ER3-05-2016 Enabling Aviation Infrastructure: CNS
      (2)
    • SESAR-ER3-06-2016 ATM Operations, Architecture, Performance and Validation
      (2)
    • SESAR-VLD1-01-2016 Arrival Management Extended to En-route airspace
      (1)
    • SESAR-VLD1-02-2016 Integrated Airport
      (1)
    • SESAR-VLD1-03-2016 Network collaborative Management
      (1)
    • SESAR-VLD1-04-2016 Initial Trajectory Information sharing
      (1)
    • SESAR-VLD1-06-2016 Increased access to airports for low visibility mixed fleet operations
      (1)
    • SESAR-VLD1-09-2016 Solutions for General Aviation and Rotorcraft
      (2)
    • SESAR-VLD1-10-2016 Safe integration of drones
      (3)
  • H2020-SESAR-2019-1
    (15)
    • SESAR-IR-VLD-WAVE2-01-2019 PJ.19 W2 Content Integration, Performance Management and Business Case Development
      (1)
    • SESAR-IR-VLD-WAVE2-02-2019 PJ.20 W2 Master Planning
      (1)
    • SESAR-IR-VLD-WAVE2-03-2019 PJ.02 W2 Airport airside and runway throughput
      (1)
    • SESAR-IR-VLD-WAVE2-04-2019 PJ.04 W2 Total airport management
      (1)
    • SESAR-IR-VLD-WAVE2-05-2019 PJ.05 W2 Digital technologies for Tower
      (1)
    • SESAR-IR-VLD-WAVE2-06-2019 PJ.07 W2 Optimised airspace users operations
      (1)
    • SESAR-IR-VLD-WAVE2-07-2019 PJ.09 W2 Digital Network Management Services
      (1)
    • SESAR-IR-VLD-WAVE2-08-2019 PJ.01 W2 Enhanced Arrival and Departures
      (1)
    • SESAR-IR-VLD-WAVE2-09-2019 PJ.18 W2 4D skyways
      (1)
    • SESAR-IR-VLD-WAVE2-10-2019 PJ.10 W2 Separation Management and Controller Tools
      (1)
    • SESAR-IR-VLD-WAVE2-11-2019 PJ.13 W2 IFR RPAS
      (1)
    • SESAR-IR-VLD-WAVE2-12-2019 PJ.14 W2 Integrated CNSS
      (1)
    • SESAR-IR-VLD-WAVE2-14-2019 VLD.01 W2 GBAS/SBAS precision approaches including variable approach paths
      (1)
    • SESAR-IR-VLD-WAVE2-15-2019 VLD.02 W2 Airport Surface Management, Airport Safety Nets and ATSAW
      (1)
    • SESAR-IR-VLD-WAVE2-16-2019 VLD.03 W2 Improving runway throughput in one airport
      (1)
  • H2020-SESAR-2019-2
    (41)
    • SESAR-ER4-01-2019 Digitalisation and Automation principles for ATM
      (4)
    • SESAR-ER4-03-2019 Complexity and BigData
      (1)
    • SESAR-ER4-04-2019 Digital Information Management
      (1)
    • SESAR-ER4-05-2019 Environment and Meteorology for ATM
      (6)
    • SESAR-ER4-06-2019 Safety and Resilience
      (2)
    • SESAR-ER4-07-2019 Accelerating Change in ATM
      (1)
    • SESAR-ER4-08-2019 Behavioural economics in ATM
      (1)
    • SESAR-ER4-10-2019 ATM Role in Intermodal Transport
      (4)
    • SESAR-ER4-11-2019 CNS for ATM
      (2)
    • SESAR-ER4-13-2019 Innovation in Airport Operations
      (3)
    • SESAR-ER4-15-2019 Digitalisation of the ATM Network
      (1)
    • SESAR-ER4-16-2019 Innovation in Network Management
      (2)
    • SESAR-ER4-18-2019 Automation and CWP
      (1)
    • SESAR-ER4-19-2019 Innovation in Air Traffic Services
      (1)
    • SESAR-ER4-24-2019 CNS
      (1)
    • SESAR-ER4-26-2019 ATM Validation
      (1)
    • SESAR-ER4-27-2019 Digitalisation of the ATM Architecture
      (1)
    • SESAR-ER4-28-2019 Control of IFR RPAS in the TMA
      (1)
    • SESAR-ER4-29-2019 RWC for integration in Class D-G Airspace
      (1)
    • SESAR-ER4-30-2019 Reduced Crew Operations Contingency Management
      (1)
    • SESAR-ER4-31-2019 U-space
      (5)
Powered by Chris Decubber BV